We take the network underground — and bring it back without a trace.
MS GROUP lays telecom and electric cable, executes pipeline work, and runs Horizontal Directional Drilling (HDD) crossings for utility, government and private contracts across Bhubaneswar.
Full-scope underground infrastructure work
From the first survey peg to final surface restoration, MS GROUP handles every stage of telecom, power and pipeline installation.
Telecom Cable Laying
Underground OFC and telecom duct installation for network operators, from route planning through splicing-ready ducting.
Fibre / DuctUnderground Electric Cable
LT/HT power cable laying with proper depth, bedding and marker tape as per utility standards.
LT / HT CableHDD — Horizontal Directional Drilling
Trenchless bores under roads, rail lines and built-up areas — for cable and pipe crossings without cutting the surface.
TrenchlessPipeline Work
Underground pipeline laying and jointing for water, gas and utility ducting projects of varying diameter.
Utility PipeRoute Survey & Planning
Utility mapping and bore-path planning to identify existing crossings before a single trench is opened.
Pre-workTrenching & Restoration
Open-cut trenching where needed, followed by backfill and surface reinstatement to original condition.
CivilA crossing, drawn the way our crews see it underground
Horizontal Directional Drilling lets us route cable and pipe beneath roads and existing utilities without opening the surface — this is the same cross-section our teams plan before every bore.
A drill head enters at a shallow angle from the entry pit, tracks a curved path beneath the road and any existing utilities, and surfaces at the exit pit — where cable, duct or pipe is pulled back through the bore.
Four stages, start to backfill
Site & utility mapping
We walk the route, mark existing cable, pipe and duct crossings, and confirm access for rigs and machinery.
Bore & trench planning
Depth, entry/exit points and method — open-cut or HDD — are fixed against the site survey and client spec.
Drilling & cable laying
Crews carry out the bore or trench and lay telecom, electric or pipeline material to the planned route.
Backfill & handover
Surface is reinstated, the route is documented, and the site is handed back in working condition.
Local crews, underground discipline
Based in Patrapada, working across Bhubaneswar
On-ground local knowledge of routes, soil conditions and local authority requirements.
Telecom, power and pipeline under one crew
No handoffs between separate contractors — survey, drilling, laying and restoration in one scope.
HDD for sensitive crossings
Trenchless boring where cutting a road, footpath or built-up surface isn't an option.
Site restored, not just laid
Backfill and surface reinstatement is part of the job, not an afterthought.
Underground work is judged by what you don't see once it's finished — a clean line, a settled surface, a network that just works.PATRAPADA · BHUBANESWAR · ODISHA
Talk to us about your route
Call, mail, or come by the office in Patrapada — we'll walk through the site requirements with you.